Skip to content
Flooring Express
Herringbone engineered timber laid through a naturally lit waterfront gallery space.
Portfolio Case Study

Hobart Waterfront Gallery: Herringbone Under Gallery Light

An engineered oak herringbone set out from the room's sightline rather than its walls, which are not square.

Project Category
Commercial Cultural
Location
Hobart Waterfront, TAS
Material Selection
Engineered Oak Herringbone
Installation Time
16 Working Days

The Challenge & Vision

A converted warehouse where no two walls are parallel and the fall across the slab is 40mm. Herringbone shows every setting-out error, and a gallery lit from above shows every high spot as a shadow. The pattern had to look deliberate from the entry, which meant ignoring the walls entirely.

Herringbone blocks being dry-laid to establish the setting-out line.
Perimeter border blocks absorbing the out-of-square at a gallery wall.

The Solution

We set the pattern out from the sightline through the entry doors, not from any wall, and absorbed the out-of-square into a wide border block at the perimeter. The slab was levelled to a 2mm tolerance over three metres before a single block went down — tighter than the code calls for, because raking gallery light is unforgiving.

Details That Carry a Gallery

  • Sightline Setting-Out

    The pattern reads square from the entry even though the building is not.

  • 2mm Tolerance

    Levelled tighter than code so raking overhead light casts no shadow lines.

  • Border Blocks

    A wide perimeter border takes up the out-of-square without a visible taper.

Project Details

Client
Hobart Waterfront Gallery
Location
Hobart Waterfront, TAS
Total Area
310 sqm
Timeline
16 Working Days
Material
Engineered Oak Herringbone, 600×120mm

Setting Out the Herringbone

View Next Project

Claremont Townhouses

Inspired by this project?

Tell us about your space and we will walk you through the options, the timeline and the cost.